IHS Inc., Home - http://www.ihs.com

ACI SP-15 Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References


Purchase Information
Use this form to request purchase information on ACI online subscriptions.
ACI Collections
First Name:

Last Name:

Email address:

Document ACI SP-15 is offered by IHS as part of an online subscription. This subscription contains many documents on the same topic.

You may also purchase this document alone from the IHS Standards Store.


ACI SP-15 Document Information:

Title
Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References

American Concrete Institute

Publication Date:
Nov 1, 2005

Scope:

PREFACE

ACI Specification 301 is intended to be used by reference or incorporation in its entirety in the Project Specification.  Do not copy individual Parts, Sections, Articles, or Paragraphs into the Project Specification, because taking the out of context may change their meaning.

If Sections or Parts of ACI Specification 301 are copied into the Project Specification or any other document, do not refer to them as an ACI Specification, because the specification has been altered.

A statement such as the following will serve to make ACI Specifications 301 a part of the Project Specification:

"Work on (Project Title) shall conform to all requirements of ACI 301-05 published by the American Concrete Institute, Farminton Hills, Michigan, except as modified by these Contract Documents."

Each technical Section of ACI Specification 301 is written in the three-part Section format of the Construction Specifications Institute, as adapted for ACI requirements.  The language is imperative and terse.

The Specification is written to the Contractor.  When a provision of this specification requires action on the Contractor's part, that verb "shall" is used.  If the Contractor is allowed to exercise an option, the verb "may" or, when limited alternatives are available, the conjunctive phrase "shall either... or..." is used.  Statements provided in the specification as information to the contractor use the verb "amy" or "will".  Informational statements typically identify activities or options that "wil" be taken or "may" be taken by the Owner or the Architect/Engineer.

 

Keywords:

floors
specification
concrete slab
cementitous materials
admixture
reinforcement
prestressed concrete
reshoring
cold weather
density
air entrainment
concrete
reinforced concrete
hot-weather
shrinkage-conpensating concrete
formwork
grouting
consolidation
concrete durability
conveyor
placing
subgrade
repair
concrete construction
tolerance
exposed-aggregate finish
joint (construction, contraction, and isolation)
lightweight concrete
welded wire reinforcement.
prestressing steel
inspection
curing
architectural concrete
mix
water-cementitous material ratio
cement
aggregate
finish
shoring
test
grout
temperature
mixture proportion
compressive strength

About IHS
IHS (NYSE: IHS) is a leading global provider of critical technical information, decision-support tools and related services in a number of industries including aerospace and defense, automotive, construction, electronics, and energy. IHS serves customers ranging from large governments and multinational corporations to smaller companies and technical professionals in more than 100 countries. IHS been in business for more than 45 years and employ more than 2,300 people around the world.

 

Legal Statement | Site Map | Privacy Policy | Standards Store

Redirector