IHS Inc., Home - http://www.ihs.com

ASHRAE GUIDELINE 0 The Commissioning Process


Purchase Information
Use this form to request purchase information on ASHRAE online subscriptions.
ASHRAE Collections
First Name:

Last Name:

Email address:

Document ASHRAE GUIDELINE 0 is offered by IHS as part of an online subscription. This subscription contains many documents on the same topic.

You may also purchase this document alone from the IHS Standards Store.


ASHRAE GUIDELINE 0 Document Information:

Title
The Commissioning Process

American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.

Publication Date:
Feb 9, 2005

Scope:

The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from pre-design through occupancy and operation, without regard to specific elements, assemblies, or systems, and provide the following:

(a) overview of Commissioning Process activities,

(b) description of each phase’s processes,

(c) requirements for acceptance of each phase,

(d) requirements for documentation of each phase, and

(e) requirements for training of operation and maintenance personnel.

These Commissioning Process guideline procedures include the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0.

About IHS
IHS (NYSE: IHS) is a leading global provider of critical technical information, decision-support tools and related services in a number of industries including aerospace and defense, automotive, construction, electronics, and energy. IHS serves customers ranging from large governments and multinational corporations to smaller companies and technical professionals in more than 100 countries. IHS been in business for more than 45 years and employ more than 2,300 people around the world.

 

Legal Statement | Site Map | Privacy Policy | Standards Store

Redirector